
Master Bath Tile Shower Remodel
A dated tub alcove became a curbless tile shower with a linear drain, recessed niche and frameless glass.
The homeowners wanted the tub gone and a walk-in shower in its place. We relocated the drain, set a linear trough, waterproofed the pan and walls, and re-plumbed the valve for a thermostatic mixer.
Matte black trim throughout, a recessed shampoo niche, and frameless glass finished it off. Six working days from demo to first shower.
What the job involved
- Tub removal and drain relocation
- Linear drain and sloped pan
- Pressure-balancing thermostatic valve
- Waterproofing and tile substrate
- Frameless glass enclosure
- New vanity supply and drain
More of our work
Other jobs we’ve finished.
Grease Interceptor Installation
An interior grease interceptor set and piped for a commercial kitchen, inspected and signed off first pass.
2024 · 1 week View
Sanitary Sewer Main Extension
Sewer main extended across a new development — laser-set grade, bedded stone, and camera-verified before backfill.
2025 · 3 weeks View
Water Service Line Replacement
A leak between the meter and the house, replaced end to end in new poly — yard restored, permits handled.
2024 · 2 days ViewGo With A Pro
Let’s get your plumbing sorted.
Call or text for a straight answer and a written price. Emergency? We answer the phone.
Mon–Fri 7am–5pm · Saturday by appointment
Emergencies answered anytime